娇妻被老板粗大猛烈进出高潮女女如何高潮|女教师少妇高潮免费|被上司侵犯电影|91人妻p|冷艳办公室人妻h|强行插入人妻|大美女18禁|男女无遮挡xxoo视频|日韩激情射精|激情中文字幕人妻一区,强暴清纯校花,把腿张开老子臊烂你女人片偷窥会所美女私密保健啪啪 ,浴室里的妹妹

Requirements and key points of cold heading machine transformation

Current location:Home  / News  / Industry information / Requirements and key points of cold heading machine transformation

Requirements and key points of cold heading machine transformation

date:[2020-02-24]     pk_hits:

Requirements for cold heading machine transformation

1. The speed change system is safe and reliable, making the machine tool stable and continuous speed change.

2. The digital display device is added to measure the number of processed pieces. The device has the function of setting the total number of processed pieces, automatically stopping when the set value is reached, and continuously counting when the machine needs to be stopped in the middle to replenish materials or starts up again after a fault occurs.

3. Without changing the mechanical transmission system of the machine tool, it is transformed into stepless speed regulation, and the speed regulation range is 30~120 pieces/min.

Key points of use of cold heading machine

1. Rust removal and straightening shall be carried out in the 120~130mm area of the cold heading part of the reinforcement (wire);

2. The diameter of steel bar or steel wire shall meet the requirements of cold upsetting machine, and it is not allowed to cold upset the over thick or thin steel bar (wire);

3. Within the allowable range of cold heading diameter of the cold heading machine, the position of the clamp (screw in or screw out) can be adjusted according to the required size of the anchor head, so as to obtain a proper allowance for reinforcement (wire) extension;

Measures to Improve Maintenance Level of Cold Heading Machine

Technicalization is to formulate various maintenance process procedures according to different equipment, and maintain according to the procedures.

In order to improve the maintenance level of cold heading machine, the maintenance work should be standardized, processed and institutionalized.

Standardization is to make the maintenance content unified. What parts should be cleaned, which parts should be adjusted, and which devices should be inspected should be considered and specified according to the conditions of each enterprise and the objective laws.


Pingyang Tianwei Machinery Co., LtdFull system solutions for quality machinery manufacturers

All product pictures and publicity pictures of this website belong to us. No individual or organization is allowed to use them, and any embezzlement must be prosecuted.

Pingyang Tianwei Machinery Co., Ltd

Tel:0577-86266681Tel:0577-86125986mobile phone:13806699071E-mail:[email protected]Add: Haixi Industrial Park, Pingyang County, Wenzhou, Zhejiang

WeChat

Service hotline

13806699071

We warmly welcome your consultation, and we will provide you with satisfactory mechanical solutions